Last minute


Lundin Gold ramping up Ecuador project - Mining Weekly
Creamer Media's Mining Weekly
Moving forward with the engineering and procurement of the process plant for its Fruta del Norte gold project, in Ecuado, TSX-listed Lundin Gold has ordered ...

and more »

Teleeye SA Collaborates With Flir Systems On Critical Temperature Monitoring
Creamer Media's Engineering News
Remotely monitoring equipment and facilities with thermal cameras can detect faults unseen to the human eye. This means a rise in ... In mining, monitoring temperatures has a role to play in preventative maintenance on critical equipment. In utilities ...


Canadian Mining Journal

GOLD: Lundin orders long lead time processing equipment for Fruta del Norte project
Canadian Mining Journal
Detailed engineering contracts for the mill, tailings facility and water management have been awarded. The contract for the power transmission line has been awarded. Finally, major earthwork activities are started as has work on the mill. The mine ...


'Mine-blowing' automated door solutions from Maxiflex
Creamer Media's Engineering News
A range of superior quality, rugged automated door solutions, engineered to meet increased safety, efficiency and productivity on mines, are available from South Africa's leading door and loading dock specialist, Maxiflex. ... and the high-performance ...


Lundin Gold Orders Long-Lead Time Process Plant Equipment and Confirms Mine Development is Underway
Junior Mining Network
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Oct. 18, 2017) - Lundin Gold Inc. ("Lundin Gold" or the "Company") (TSX:LUG) (OMX:LUG) is pleased to announce that long-lead time process plant equipment for its Fruta del Norte gold project ("Fruta del ...

and more »
 




Bookmark us
  • Bookmark this page on StumbleUpon
  • Bookmark this page on del.icio.us
  • Bookmark this page on Digg
  • Bookmark this page on Reddit